The operational challenge
Tyres rebound, contain reinforcement and can bridge if they are presented poorly. The feed mix and downstream separation process govern the appropriate first-stage reduction.
Bulky waste · Commercial waste · Construction & demolition waste

ELASTOMER PROCESSING
Grip and reduce suitable tyre and rubber streams using shaft tooling selected around elasticity, steel content and the required downstream fraction.

Tyres rebound, contain reinforcement and can bridge if they are presented poorly. The feed mix and downstream separation process govern the appropriate first-stage reduction.
Star or combination shafts bite into the tyre body and pull it through the chamber. The selected screen and magnet arrangement must be considered alongside steel content and target output.

LIKELY CONFIGURATION DISCUSSION
These are starting points for assessment, not a final specification.
MATERIAL & PROCESS EVIDENCE
Official imagery and footage provide context; a representative demonstration should document the actual input condition and the output required by the next process.


OFFICIAL PLATFORM FOOTAGE
No material-specific WERT-channel clip is presented for this feed. The general PHANTOM film shows the platform only; arrange a representative assessment for the actual input and output requirement.

OFFICIAL WERT VIDEO
Accessible video summary: Official WERT Recycling Technik film introducing the PHANTOM platform and its innovation-award case.
Caption status: availability has not been independently verified. The player requests English captions when the publisher provides them.
Transcript status: no reviewed transcript is currently published. The written summary above provides a concise alternative; contact WERT UK for help with the technical content.
Playing the video connects your browser to YouTube’s privacy-enhanced player.
AVERAGE STATED THROUGHPUT
| Material | Average stated range |
|---|---|
Rubber | approximately 13–18 tonnes per hour |
Performance qualification. Performance figures are manufacturer-stated averages and are not guaranteed. Actual throughput will vary according to material, shaft configuration, screen-basket settings, material feed and operating conditions.
PERFORMANCE VARIABLES
MODEL CONSIDERATIONS
A trial should compare draw-in and output, then consider diesel or electric site operation. Do not select solely from engine power.
MAINTENANCE CONSIDERATIONS
Check cutting edges and chamber clearances, manage steel wire around downstream equipment, and inspect for wrapping or heat build-up.
RELATED SHAFTS
APPLICATION FAQ
Tyres are an official WERT application, but diameter, construction and presentation must be confirmed before a final specification.
The current manufacturer-stated average is approximately 13–18 tonnes per hour, subject to the published qualification.
The PHANTOM can provide a reduction stage. The complete downstream process and target specification still need to be engineered.
ENQUIRY DETAILS
The more representative the information, the more useful the next technical discussion can be. Required fields are marked by your browser.