Bulky waste · Commercial waste · Construction & demolition waste

Call 07447404760support@wertuk.comBook a demonstrationService & support

WOOD PROCESSING

Waste Wood & Timber Shredding

Process pallets, waste timber and selected bulky wood with shaft geometry chosen for draw-in behaviour, output definition and the contamination profile.

WERT PHANTOM 770 Plus processing waste wood
01

The operational challenge

Wood streams combine long pieces, fines, metal fixings, varying moisture and occasional oversize items. Reliable processing depends on consistent presentation and a shaft that controls draw-in without excessive recirculation.

02

How twin-shaft shredding addresses it

Star or combination shafts pull timber into the chamber and reduce it continuously. The screen arrangement can help define the output, while an assessed magnet option may support ferrous separation downstream.

WERT PHANTOM 770 Plus processing waste wood

LIKELY CONFIGURATION DISCUSSION

Start with shafts, counter tools and the screen.

Shafts

  • Star shaft
  • Combination shaft
  • Wood shaft

Tooling

  • Wood breaker-bar configuration
  • Counter rake
  • Screen basket selected for the target output

These are starting points for assessment, not a final specification.

MATERIAL & PROCESS EVIDENCE

Connect the feed evidence to the cutting system and required discharge.

Official imagery and footage provide context; a representative demonstration should document the actual input condition and the output required by the next process.

WERT PHANTOM 770 Plus processing waste wood
Application and feed-process context
WERT star-shaft tooling for a twin-shaft shredder
Likely shaft or tooling family for technical assessment

MATERIAL-SPECIFIC WERT FOOTAGE

Watch the process before specifying it.

Use the footage to compare feed shape, loading, chamber behaviour and visible discharge. It is evidence for discussion, not a throughput guarantee.

OFFICIAL WERT VIDEO

Construction and tear-down timber

Accessible video summary: Official WERT-channel footage covering timber from construction and demolition streams.

Caption status: availability has not been independently verified. The player requests English captions when the publisher provides them.

Transcript status: no reviewed transcript is currently published. The written summary above provides a concise alternative; contact WERT UK for help with the technical content.

Playing the video connects your browser to YouTube’s privacy-enhanced player.

AVERAGE STATED THROUGHPUT

Benchmark the discussion carefully.

Manufacturer-stated average throughput
MaterialAverage stated range
Mixed broken timber and waste woodWaste woodapproximately 35–42 tonnes per hour

Performance qualification. Performance figures are manufacturer-stated averages and are not guaranteed. Actual throughput will vary according to material, shaft configuration, screen-basket settings, material feed and operating conditions.

PERFORMANCE VARIABLES

What will change the result.

MODEL CONSIDERATIONS

Power is part of the decision, not the whole decision.

A higher installed power figure is not a substitute for matching shafts and screen settings to the wood stream. Compare Standard, Plus and Hyperion after a representative trial.

MAINTENANCE CONSIDERATIONS

Plan around the actual wear mechanism.

Monitor hooks, teeth, counter rakes and wear plates for rounded edges or impact damage. Remove non-processable contaminants before they reach the chamber wherever practicable.

RELATED SHAFTS

Explore the likely tooling families.

APPLICATION FAQ

Questions to settle before specification.

01Can it process pallets and mixed waste timber?

Those streams can fall within the stated wood applications, subject to contaminants, dimensions and the selected shaft and screen system.

02What output size will it make?

Output is configuration-dependent. A combination shaft and suitable screen can give a more defined result, but WERT UK should assess the actual target product.

03Can metal fixings be separated?

An optional hydraulically height-adjustable overband magnet is listed. Separation performance depends on material presentation and the selected equipment.

ENQUIRY DETAILS

Tell us what you need to process

The more representative the information, the more useful the next technical discussion can be. Required fields are marked by your browser.

  • Source page and selected configuration are recorded
  • Files are held privately with the enquiry
  • No response time or technical result is promised online

This form records the request securely before any automated CRM or notification delivery is attempted.

CallBook a demoRequest a quote